Talk to an engineer

Free tool

How long will your migration take?

Three inputs, one honest estimate. It runs in your browser, and nothing is sent anywhere unless you choose to share it.

1How big is your archive?
studies
2What's in it?
3How many migration servers?
2 1 to 10. More servers move data faster, but each adds setup and coordination time.
your estimateupdates as you type
Estimated duration -
Studies-
Data volume-
Data transfer Setup, testing and validation
Send this estimate to an engineer

Assumes at least 1 Gb network bandwidth, a source archive on spinning disks and 95% uptime. Real throughput depends on how your source PACS handles retrieval, which varies by vendor and version. A free data assessment replaces this estimate with measured numbers.

How the estimate works

Volume

Study count multiplied by average study size. Pick the mix closest to your archive.

Throughput

Each migration server moves a set number of studies per day: about 30,000 light studies, 20,000 typical or 10,000 heavy.

Setup and validation

Every project includes time to install, test, reconcile and sign off. That is why even a small archive takes about four weeks.

Want the real number?

The free data assessment measures your actual archive: true volume, data quality issues and the throughput your source system can sustain.

Request a free assessment